Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4123704 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of Bridge Cum Bandhara On Road Palshi To Shindephal At Ch.3/710 Taluka-sengaon Dist- Hingoli. |
| Last Date For Submission | 12th May, 2026 |
| Opening Date | 14 May, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 150000.00 |
| Estimated Cost | 24805038.00 |
| City | Hingoli |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I) Ordinary soil | 1073.250 | Cum |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary rock (not requiring blasting) | 317.00 | Cum |
| 3 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Hard rock (requiring blasting) | 180.35 | CuM |
| 4 | Dewatering including diversion of stream, providing cofferdams, bunds, etc. as may be necessary for foundation and other parts of the work and bailing out water during and after excavation as required. For Abutment | 129.82 | CuM |
| 5 | Dewatering including diversion of stream, providing cofferdams, bunds, etc. as may be necessary for foundation and other parts of the work and bailing out water during and after excavation as required. For Pier | 74.22 | CuM |
13 Days Left