Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4852594 |
|---|---|
| Organisation Name | Haryana Urban Development Authority |
| Tender Brief | Rough Cost Estimate For Cleaning Of Silt From Manholes And S.w. Pipe Sewer Lines Of Various Sizes Including Manhole By Sewer Cleaning Machine And Disposal Of Same From Outside The Residential Area In Sector-1and4 Hisar. |
| Last Date For Submission | 11th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 69100.00 |
| Estimated Cost | 3454174.00 |
| City | Hisar |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | [21.103.1]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 1. 200 mm i/d [Through Rate] | $14835.00 | Per Metre |
| 2 | [21.103.2]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 2. 250 mm i/d [Through Rate] | $595.00 | Per Metre |
| 3 | [21.103.3]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 3. 300 mm i/d [Through Rate] | $1015.00 | Per Metre |
| 4 | [21.103.4]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 4. 350 mm i/d [Through Rate] | $510.00 | Per Metre |
| 5 | [21.103.5]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 5. 400 mm i/d [Through Rate] | $235.00 | Per Metre |
4 Days Left