Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4442372 |
|---|---|
| Organisation Name | Municipal Affairs Department |
| Tender Brief | Improvement Of Water Supply By New Laying Of 160 Mm Dia And 110 Mm Dia Hdpe Pipes Including Replacements Of Old Damaged Existing Pipes (150 Mm Dia And 100 Mm Dia C.i Pipes) By New Pipes |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 18 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 78965.00 |
| Estimated Cost | 3948230.00 |
| City | hoigebazar |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C Ref:- UD & MAD (Schedule) 2018, P-2, it. No. - 1.4 | 10.00 | Each |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. a) upto 150 mm. Thick Ref: P.W.D (Bldg) Sch. -2017, page -10 It- 2(a) | 135.00 | Cu.M. |
| 3 | Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptus or other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately.) (a)75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/other approved timber posts @ 1.60m apart (ii) Railing with 3 rows. Ref:- UD & MAD (Schedule) 2018, P-3, it - 1.8(a)(ii) | 200.00 | M |
| 4 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge). (a) Depth upto 1.5 m. Ref:- UD & MAD (Schedule) 2018, P-3, it - 1.6(a). | 20.00 | Sq. M |
| 5 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity) Ref:-UD & MAD (Schedule) 2018, P-2, it - 1.3(a) | 135.00 | % Cu.M. |
15 Days Left