Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4147888 |
|---|---|
| Organisation Name | Water Supply And Sanitation Department |
| Tender Brief | Corrigendum : Dwss Asalpur Sathiana |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 18 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 112264.00 |
| Estimated Cost | 5613206.00 |
| City | Hoshiarpur |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Drilling Trial Bore using Telescopic Method with suitable rig to extract water samples of different strata s encountered during drilling to check water quality with respect to Physical & Chemical Analysis, Heavy Metals such as Iron, Nitrate, Arsenic, Fluoride, Selenium, Uranium etc. The payment for testing water sample will be paid extra as per the quoted rates against relevant items of this bid. However the rates includes analysis of sand of all strata from where the water sample have been collected. (It should be ensure that the water sample is collected by an officer of rank not less than SDE) | 150 | mtr. |
| 2 | WATER SUPPLY | ||
| 3 | Drilling of 500mm dia bore with Reverse Rotatry Rig in all kinds of soil including the cost of consumable stores, fuel oil and transportation of rig to the site. complete in all respect. | ||
| 4 | a) Drilling of 500mm dia bore with Reverse Rotatry Rig Upto 150 m depth BGL. | 150 | mtr |
| 5 | b) Drilling of 500mm dia bore with Reverse Rotatry Rig Beyond 150 m depth BGL up to 300 Mtr Note: 1. Erection of dismantling of boring plant including all arrangement for the transportation of the boring equipment to site of work from the store of contractor at site and back are to be made by the contractor at his own cost. All rates should be quoted for supplying the material at site of work for collection of water and water for drilling tubewell to be arranged by the firm/contractor at site at his own cost. 2.In case the bore is converted into a tubewell payment of bore shall be made up to the bail plug, plus margin (7% of main bore drilling or as actual as per field requirement whichever is less) required for sustaining the main bore paid at the rate of beyond margin shall be paid at the rate of test bore drilling. | 40 | mtr |
6 Days Left