Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4504266 |
|---|---|
| Organisation Name | Municipal Administration And Water Supply Department |
| Tender Brief | Corrigendum : Providing Storm Water Drains Integrated With Waterbodies In Hosur City Municipal Corporation - Package-7 |
| Last Date For Submission | 23rd Jul, 2026 |
| Opening Date | 23 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 2417000.00 |
| Estimated Cost | 241700000.00 |
| City | Hosur |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of Primary Drains Cleaning Juliflora (Prosafis) Jungle including with uprooting and removing of Juliflora stumps | 121032.00 | Sqm |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete and as directed by the Engineer in charge. | 301.00 | Cum |
| 3 | Trimming the bed and the side slope of the Nallah/River bank in all soils except hard rock upto a thickness of 7.5 cm to 15 cm etc., Completed and as directed by the Engineer in charge. | 20079.00 | Sq.m |
| 4 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete and as directed by the Engineer in charge. (having width up to 3m) | 977.00 | Cum |
| 5 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete and as directed by the Engineer in charge. (having width of 3m -10m) | 2583.00 | Cum |
16 Days Left