Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3725057 |
|---|---|
| Organisation Name | Irrigation And Waterways Department |
| Tender Brief | Corrigendum : Clearing And Removing Of Water Hyacinth , Plastic , Thermocol , Garbage Etc.including Clearing Of Jungles Along The Slope Of Bank From Ch.3000.0 M To 7200.0 M Of Howrah Drainage Channel For The Period Of 365 Days, Bankra -ii G.p |
| Last Date For Submission | 13th Apr, 2026 |
| Opening Date | 17 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 19313.00 |
| Estimated Cost | 965661.00 |
| City | Howrah |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete. | 14080.00 | Sqm |
| 2 | Clearing and removal of debris (including floating debris) including sludge & slush mixed with all sorts of industrial waste, solid/semi-solid compact mass formed due to water hyacinth in combination with industrial wastes, carcasses, municipal garbage sludge, polypacks, thick and thorny jungles and long grass etc. and depositing, spreading the same on the canal bank and later burnt to ashes when dry including all leads and lifts complete. | 13824.00 | Sqm |
| 3 | Clearing and removing solid / semisolid compact mass formed due to water hyacinth in combination with industrial waste, carcasses, municipal garbage, sludge, thick and thorny jungles and long grass etc. and disposal of lifted water hyacinth / semi-solid compact mass by truck or by any other conveyance over kuncha / pucca road including making access for plying the truck or any other conveyance beyond 240 m from the lifting point including cost of loading , unloading , transporting, arrangement of land, if required by the agency all complete including all leads and lifts. Mode of measurement : Payment will be made on the basis on the stack measurement after deducting voids @ 40 %. | 4003.20 | Cum |
| 4 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 8500.00 | Sqm |
11 Days Left