| Tender ID | 4860275 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Restoration Of Bituminous Road Along With Alternative Laying Of Di Hdpe Pe100 Pn6 Pipes From 1 Gabtala Karatberia Bridge To Nayachak 2nd Tw Site 2routa Pry School To Madhubati More Via. Gabtala Karatberia Bridge Nayachak More 2nd Tw Nayach Nayachak . |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 250.00 |
|---|---|
| EMD | 130500.00 |
| Estimated Cost | 6520567.00 |
| City | Howrah |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specifications Clause 201 for Rural Roads of MORD. By Manual Means | 1.440 | Hect. |
| 2 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (Borrow pit /pre work post work measurement) e) Carriage up to total lead of 5.0 km. | 1296.00 | Cum |
| 3 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. | 4867.50 | Sqm |
| 4 | (b) For each additional Depth of 150mm and part thereof. | 9735.00 | Sqm |
| 5 | (A) Filling in foundation or plinth by silver sand in layer not exceeding 150mm as directed and consolidating the same by through saturation with water ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 942.75 | Cum |