Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Mishra Dhatu Nigam Limited
Tender ID4645023
Organisation NameMishra Dhatu Nigam Limited
Tender BriefCorrigendum : Construction Of Hazardous Storage Facility At Armour Unit, Rohtak For Midhani, Rohtak
Last Date For Submission13th Jul, 2026
Opening Date14 Jul, 2026
Cost
Document Cost0.00
EMD30000.00
Estimated Cost1217691.00
Location
CityHyderabad
StateTelangana

Register to see full details

BOQ Items
#ItemQtyUnits
1Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.100.00sqm
2Earth work in excavation of all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for lift upto 1.5m, as directed by Engineer-incharge.81.90cum
3Supply and laying of clean, well-graded Tibba sand for earthwork in filling including spreading, leveling, watering, and mechanical compaction in horizontal layers not exceeding 200 mm loose thickness to achieve a minimum of 85% of Modified proctor Maximum Dry Density (MDD) all depth and locations as per direction of Engineer -in- Charge.60.00cum
4Providing and laying in position cement concrete of specified grade 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering, complete as directed by Engineer-in-charge.17.04cum
5Supplying, fitting and placing Fe-500 bar-TMT reinforcement (Min 415N/mm2) reinforcement in RCC works complete as per drawings and technical specifications for bars including over laps and wastage, where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel, placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of works.1,493.41kgs
13th Jul, 2026

25 Days Left

WhatsApp