Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4645023 |
|---|---|
| Organisation Name | Mishra Dhatu Nigam Limited |
| Tender Brief | Corrigendum : Construction Of Hazardous Storage Facility At Armour Unit, Rohtak For Midhani, Rohtak |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 30000.00 |
| Estimated Cost | 1217691.00 |
| City | Hyderabad |
|---|---|
| State | Telangana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | 100.00 | sqm |
| 2 | Earth work in excavation of all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for lift upto 1.5m, as directed by Engineer-incharge. | 81.90 | cum |
| 3 | Supply and laying of clean, well-graded Tibba sand for earthwork in filling including spreading, leveling, watering, and mechanical compaction in horizontal layers not exceeding 200 mm loose thickness to achieve a minimum of 85% of Modified proctor Maximum Dry Density (MDD) all depth and locations as per direction of Engineer -in- Charge. | 60.00 | cum |
| 4 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering, complete as directed by Engineer-in-charge. | 17.04 | cum |
| 5 | Supplying, fitting and placing Fe-500 bar-TMT reinforcement (Min 415N/mm2) reinforcement in RCC works complete as per drawings and technical specifications for bars including over laps and wastage, where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel, placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of works. | 1,493.41 | kgs |
25 Days Left