Tendering Authority: Nuclear Fuel Complex
Tender ID3665326
Organisation NameNuclear Fuel Complex
Tender BriefCorrigendum : Development And Other Miscellaneous Works Around Residential/institutional Buildings Of Nfc Kota Township.
Last Date For Submission3rd Apr, 2026
Opening Date04 Apr, 2026
Cost
Document Cost0.00
EMD888000.00
Estimated Cost44400000.00
Location
CityHyderabad
StateTelangana

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in over areas/foundation/pits/trenches etc. by mechanical means (Hydraulic excavator) / manual means/controlled blasting to required profile, level, grade, camber, etc in all soils/strata as mentioned below upto all depths as per drawing and as directed, 1.5 m in width as well as 10 sqm in plan area including dressing of excavated sides and ramming of bottoms and disposal / stacking of excavated materials within a lead of 150m and all inherent lifts and filling in layers with available earth in NFC township not exceeding 200mm, watering, consolidation etc. complete all as per specifications, drawing and as directed by Engineer-in-charge
2Soft rock/Filled Up Rock/Soils/Crushed rocks5500.00Cum
3Hard rock ( by chiselling or wedging or rock hammer and cutter or hydraulic splitter or by using machine such as poclain with jack hammer or controlled blasting or by approved chemical method as directed by EIC) 5000.00Cum
4Excavating, supplying and filling of local earth/crushed sand from outside by mechanical transport also including ramming and watering of the earth in layers not exceeding 20 cm in top/bottom/sides of foundation, reservors, road formation, etc. Complete for all leads as available from approved source of query.6000.00Cum
5Lead charges within NFC Plant/township for additional lead over the initial lead by mechanical transport, including loading, unloading, stacking, the disposable soil, rock , other unserviceable materials etc., Note: Measurement of lead charges will be based on truck measurement with a deduction of voids @20% and 50% for rock, debris etc.
3rd Apr, 2026

7 Days Left