Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3993574 |
|---|---|
| Organisation Name | Urban Administration And Development |
| Tender Brief | Balance Work Of Construction Of Road And Nallah From Indore Road To Manchaman Behind Pmay Multi |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 30000.00 |
|---|---|
| EMD | 558400.00 |
| Estimated Cost | 111671335.00 |
| City | Indore |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees having girth up to 300 mm, removal of stumps of trees cut earlier, disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness, if required, as per Section-200 of the specifications. (Volume-1,Road and bridge work2025-26 SOR No. 2.2.2.1 Page No. 15) | 0.314 | Hectare |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead up to 1000 m as per Section-300 of the specifications.(Volume-1,Road and bridge works 2025-26 SOR No. 3.3, Page No. 24) | 6100.00 | CUM |
| 3 | Earth work in excavation for foundation, trenches for pipes / cables or drains etc. by mechanical means / manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides, disposal of excavated earth including of all lift and lead upto 50m.Disposed earth to be levelled and neatly dressed All kinds of soil | 5517.39 | CUM |
| 4 | Earth work in excavation for foundation, trenches for pipes / cables or drains etc. by mechanical means / manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides, disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. Ordinary rock USOR I.no. 18.2.2 p.no. 227 | 440.20 | CUM |
| 5 | Construction of Embankment/Sub-grade/Earthen Shoulders with material obtained from other sources, as per provisions of Section 305 of the specifications, with approved materials/soil confirming to requirements given in Table 301-1 of specifications including all lead and lifts, including cost of watering, compaction by vibratory roller/heavy pneumatic type roller etc. confirming to requirements given in Table 301- 2 of the specifications complete. (Volume-1,Road and bridge works 2025-26 SOR No. 3.12, Page No. 26) | 9121.20 | CUM |
13 Days Left