Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3781486
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Maint And Repair External Ht Supply Works And Connected Works At Tech Area Cpe Itarsi Under Ge Bhopal
Last Date For Submission4th Apr, 2026
Opening Date06 Apr, 2026
Cost
Document Cost500.00
EMD34000.00
Estimated Cost1700000.00
Location
CityItarsi
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Disconnecting electrically and mechanically outdoor distribution transformers upto 100 KVA 11KV / 0.44 KV capacity, outdoor /indoor type lowering down from 4/6 pole structure/plinth with electric precaution incl lifting of core assembly by opening of top cover and other items for checking of faults/repair and lowering / refixing the same in its original position after inspection to make it ready for transportation to carry out testing in workshop including transportation of unservicieable transformer workshop ( rate is deemed to be inclusive of transportation , T&P and men power ) and reinstalled after repair at its original position complete all as specified and directed.3.00Each Job
2Disconnecting electrically and mechanically outdoor distribution transformers upto 500 KVA 33KV / 11 KV capacity, outdoor /indoor type lowering down from 4/6 pole structure/plinth with electric precaution incl lifting of core assembly by opening of top cover and other items for checking of faults/repair and lowering / refixing the same in its original position after inspection to make it ready for transportation to carry out testing in workshop including transportation of unservicieable transformer workshop ( rate is deemed to be inclusive of transportation , T&P and men power ) and reinstalled after repair at its original position complete all as specified and directed.1.00Each Job
3Taking out the unserviceable copper winding from transformer of capacity upto 500 KVA after opening top cover, and carrying out the following repair work complete all as specified and directed :- (a) Dismantling of all attachment viz breather assembly, conservator, oil temperature gauge, HT/LT bushing etc. and keeping aside for reuse.. (i) Taking out the core with winding assembly. (ii) Removing of complete winding from core and dismantling the core, cleaning of core laminate sheet and keeping aside for reuse (iii) Cleaning of complete transformer tank oil fins, removing of sludge, and making the inside surface of tank dry by blowing of hot air as directed and specified. (iv) Painting of outside surfaces of transformer complete by means of spray machine as directed. (v) Replacement double paper coated insulation including all requisite insulating materials like packing sleeves, separator, tapes etc. heating, varnishing the core and winding assembly after framing up top and bottom steel structure of transformer all as specified and directed. (vi) Fixing only HT procelain bushing with studs, nuts, washers 3 Nos. and LT procelain bushing with studs, nuts, and washers 4 Nos. and connection with primary and secondary windings and reconnecting with the main terminals as required and directed. (vii) Fixing only breather assembly, conservator, oil temperature gauge after proper cleaning, minor repairs etc. as required and directed. (viii) Replacement of all unserviceable gasket from top cover, HT/LT bushing with new one by using rubberised gasket sheet 4.0mm/6.0mm thick duly pasted with suitable adhesive . (ix) Replacement of unserviceable bolts with new one and fixing of existing serviceable bolts, nuts, washers of different sizes and tightening properly. (xi) Repositioning of core and winding assembly inside the tank, assembling complete unit and making the transformer ready for filling oil and subsequent testing as directed. (xi) Filling/topping up of new transformer oil of required quantities .2.00Each Job
4Supply only HT coils with super enamelled copper wire /DPC of high quality duly matching with the existing guage and impedance complete all as specified and as directed.75.00Kg
5Supply only LT coils with super enamelled copper wire strip/DPC of high quality duly matching with the existing guage and impedance.75.00Kg
4th Apr, 2026

6 Days Left