Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3550282 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Road, Path And Drain From Cobra Sainik Suvidha Parisar To 2 Ttr Gate Of Hq Mb Area And Provision Of Road From Building No P-82 Nar Bahadur Colony Fafa Accn (nbc) Gate In Mh Jabalpur Under Ge (west) Jabalpur |
| Last Date For Submission | 1st Apr, 2026 |
| Opening Date | 08 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 68000.00 |
| Estimated Cost | 3376000.00 |
| City | Jabalpur |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface excavation nexc 30 cm deep and averaging 15 cm and getting out soft/loose soil & getting out including cleaning all grass vegetation, saplings, brush woods under growth and trees nexc 30 cm girth complete a specie complete all as specified and directed. | 427.00 | Sqm |
| 2 | Rolling and consolidating road formation surfaces in cutting with 8 to 12 tonne capacity power roller, watering as necessary Including filling in hollows and depression and consolidating to the required level gradient and camber complete all as specified and directed. | 70.00 | Per 10 Sqm |
| 3 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and depth n. exc. 50mm deep including removing not exc 50m and stacking complete all as specified and directed. | 100.00 | Per 10 Sqm |
| 4 | M&L for Preparing unsurfaced water bound macadarli surfaces (new/old) by brushing with wire brushes for re-moving caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a priming tack coat with bituminous primer of bitumen of grade VG-10 @ 10 kg per 10 sq metres using mechanical sprayerd complete all as specified and directed. | 154.00 | Per 10 Sqm |
| 5 | M & L Soling (or sub base) 150 mm thick (Spread thickness) with broken boulders or quirred stone, interstices filled surface formed and rolled and consolidated to required gradient and camber with power roller 8 to 12 tonne, complete all as specified and directed. | 70.00 | Per 10 Sqm |
6 Days Left