Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4859599 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Special Repair Of Roof Treatment Of Building No P-118 (phase-ii) And Building No P-133 (phase-iii) At Mh Jabalpur Under Ge West Jabalpur |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 10 Aug, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 168000.00 |
| Estimated Cost | 9514000.00 |
| City | Jabalpur |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for coving,benching,coping etc including removing of rubbish from the premises. | 15.00 | Cum |
| 2 | Roughening surfaces of old concrete floor/ terrace by picking incl. taking down existing detiorated / decayed tar felt PCC tiles or any type of treatment including loose surface, scraping with scraper, chiseling, scraping of surface with wire brush or any other method, sweeping clean & washing down with water to remove dust etc. complete all as specified and directed. (Rates included for G+3 floors, and no extra payment to be made for the same). | 5900.00 | Sqm |
| 3 | Removing building materials to a distance the lead of 1.00 KM outside MD land incl in the rates incl loading, unloading and stacking at the destination including site clerance complete all as specified and directed. | 102.00 | Per Load |
| 4 | Material and labour for cement concrete 1:2:4 type B-0 using 12.5 mm graded stone aggregate as in roof padding,coping coving etc complete all as specified and directed. (Rates included for G+3 floors, and no extra payment to be made for the same). | 15.00 | Cum |
| 5 | M&L for 10 mm thick screed bed or bedding layer in CM 1:3 mixed with liquid water proofing compound as per manufactures instructions by weight of cement on concrete roof surface finished fair and even to maintain the proper slope of roof surface etc complete all as specified and directed. | 5900.00 | Sqm |
27 Days Left