Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Jaipur Vidyut Vitran Nigam Limited
Tender ID4765216
Organisation NameJaipur Vidyut Vitran Nigam Limited
Tender BriefCorrigendum : Construction Of Control Room Building, Boundary Wall, Water Supply Arrangement And Other Civil Works At 33 Kv S/s Didawali (deeg)
Last Date For Submission15th Jul, 2026
Opening Date16 Jul, 2026
Cost
Document Cost1770.00
EMD146000.00
Estimated Cost7300000.00
Location
CityJaipur
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1PART-A (Bldg.)
2B-1/1.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.2100.00sqm
3B-1/1.8 : Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or rains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils.249.00Cum
41.34 Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/Lindane emulsifiable concentrate of 20%30.00Ltr.
5B-1/1.36 Diluting and injection Chloropyrifos Emulsifiable concentrate 20% with 1% concentration for PRE-CONSTRUCTIONAL Anti termite treatment as per IS 6313 part III as amended from time to time and creating a continuous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment and excluding the cost of chemical emulsion) .123.00sqm
15th Jul, 2026

6 Days Left

WhatsApp