Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3987682 |
|---|---|
| Organisation Name | Urban Improvement Trust |
| Tender Brief | Corrigendum : Construction Of Sluice Gate At Akeli Feeder, Jaipur Bypass, Pali |
| Last Date For Submission | 22nd Apr, 2026 |
| Opening Date | 23 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 2500000.00 |
| City | Jaipur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cleaning and removal of earth, silt, sludge, kankar, boulder, building material and garbage in existing nallah/drains including construction of bye pass arrangement to byepass water with 1.5m lift from ground level and lead upto 50 m including foul & saturated condition where pumping out or bailing out of water is required, including shoring, shuttering where required and dewatering. Making access for disposal and dressing disposal side as per the directed of the Engineer.For depth above 1.50 m and upto 3.00 m | 100.000 | Cum |
| 2 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | 260.000 | Kilo Litre |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b) Hard/dense soil | 120.000 | cum |
| 4 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto (c) 40 mm | 24.540 | cum |
| 5 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete.(b) In cement sand mortar 1:4 | 50.380 | cum |
Ending Today