| Tender ID | 3843044 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Spl Rep To Sv Hall Of Aps Under Age B/r-i And Provision Of 15 Nos Tower Ac For Building No-581 Under Zone-1 Area At Jaipur Mil Stn |
| Last Date For Submission | 29th Apr, 2026 |
| Opening Date | 01 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 162100.00 |
| Estimated Cost | 9140000.00 |
| City | Jaipur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition of Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets complete all as specified and directed. | 1110.00 | Sqm |
| 2 | Providing and Fixing Channelled perforated panels of width 192mm, thickness of 15mm and length 2400 mm, made of a Moisture resistant fibre board substrate with a laminated facing as per the approved shade (Portland Maple, Sea Beach, Siam Wood & Mystique Walnut, Interior White, Alumina Pearl) and a melamine balancing layer on the reverse side. The boards shall have a special perforation pattern where the reverse surface has a Helmholtz fluted perforation with consecutive 3mm wide groove followed by 13mm of visible pane. The edges of the panel shall be tongue-and-grooved to fix special clips for installation and seamless visual. The back of the perforated panel shall have sound absorbing non-woven Soundtex acoustical fleece hot pressed to achieve NRC of 0.6. (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 and Humidity Resistance (RH) of 70% with camber limit less than 1mm/1000mm and bow less than 1mm/300mm.The panels shall be mounted on special aluminium splines (keel) using inside clips provided by Manufacturer and approved by the Architect/ Engineer-in-Charge. The panel shall be mounted by tongue and groove mechanism using inside clip on aluminium extruded keel made of Grade 6063-T5 having dimensions 3000(L) x 24(H) x 15.5(W).The keel shall also be used for transition of the butt end of adjacent panel at every 7.2m. INSTALLATION:An appropriate vapour barrier (by others) shall be applied/installed on the vertical surface before the installation to properly seal against entry of any moisture. Vapour barrier (by others) shall be installed as per Manufacturer s recommendation. Install wooden batten grid (provided by others) of section 50x50mm or as approved by the Architect on the solid wall/partition to provide level and plumb surface for fixing Keel. Install Keel vertically using screws and plugs at spacing of not more than 600mm centre-to-centre. The first and last keel should not be more than 150mm from the ends. Trim the tongue of the first bottom panel and install using headless nail with groove side upward. Subsequent panels are installed with tongue side downward by engaging with each other using tongue and groove mechanism and secured by inside clip. Continue this process until required height is achieved. Shorter butt edges need to be joined using industrial/wood glue. The keel shall also be used for transition of the butt end of adjacent panel at every 7.2m. Install the Skirting (provided by others) of width 50mm or more as required by the Architect/ Engineer-in-Charge. Finish off the edges using wooden moulding of matching colour (by others). Installation should be carried out as per Manufacturer recommended procedure complete all as specified and directed. MAKE - KNAUF CEILINGS SOLUTIONS, TOPAKAUSTIC, SAINT GOBAIN OR EQUIVALENT IN APPROVED MAKE LIST | 585.00 | Sqm |
| 3 | M & L for post construction anti-termite treatment along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc. in apron complete all as specified and directed. | 110.00 | RM |
| 4 | M & L for post construction anti-termite treatment at points of contact of wood work by chemical emulsion (in oil or kerosene based solution) @ 0.5 litre/hole by drilling 6mm dia holes at a downward angle of 45 degree at 150mm centre to centre and sealing the same complete all as specified and directed. | 80.00 | RM |
| 5 | M & L for post construction anti-termite treatment of soil under existing floors using emulsion @ one litre per hole, 300mm apart including drilling and plugging 12mm dia holes with cement mortar 1:2 (1 cement: 2 coarse sand) to match the existing floors complete all as specified and directed. | 100.00 | Sqm |