Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4928043 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair /maint Of Ci/di/gi/ppr Pipe Line Distribution System Network And Other Allied Work In Domestic Area, 3 Afru And Rajwai At Air Force Station Jaisalmer |
| Last Date For Submission | 7th Aug, 2026 |
| Opening Date | 10 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 36000.00 |
| Estimated Cost | 1800000.00 |
| City | Jaisalmer |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in trenches, not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for pipe line etc. not exceeding 10 sqm area on plan and not exceeding 1.5 metre in depth and getting out in soft / loose soil complete all as specified. | 274.40 | Cum |
| 2 | Returning filling in including spreading, levelling, watering and well ramming in layers not exc 25 cm thick complete all as specified. | 246.95 | Cum |
| 3 | Removing excavated soil to a distance not exc 50 mtr and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified. | 27.44 | Cum |
| 4 | Taking out from trench existing old unservicable rusted / corroded/Vintage CI /DI pipe of size 300 mm bore spigot and socketed ends ( including all fittings) push on tyton joints (rubber gasket) including balling out dirty / muddy water if necessary complete all as specified and as directed by Engineer-in-charge. Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works. 2. The rate of balling out dirty / muddy water is included in this item and nothing shall be paid extra on this account. | 11.00 | RM |
| 5 | Taking out from trench existing old unservicable rusted / corroded/Vintage CI /DI pipe of size 200 mm bore spigot and socketed ends ( including all fittings) rubber gasket Tyton push on Joints including balling out dirty / muddy water if necessary complete all as specified and as directed by Engineer-in-charge. Note :- 1.Excavation and earth work shall be measured & paid separately under respective items of schedule of works. 2. The rate of balling out dirty / muddy water is included in this item and nothing shall be paid extra on this account. | 16.50 | RM |
6 Days Left