Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5007540 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair Of Rusted/ Corroded/ Damaged/ Vintage Galvanized Iron Pipeline Alongwith Other Connected Items At 43 Weu (a) Ramgarh Jaisalmer |
| Last Date For Submission | 14th Aug, 2026 |
| Opening Date | 17 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 32400.00 |
| Estimated Cost | 1620000.00 |
| City | Jaisalmer |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in trenches n. exc 1.5 m in depth and not exc 1.5 m wide for laying of UG cable / pole etc and getting out including forming bottom surface to required level and gradient in soft/dense soil complete all as specified and as directed. | 580.00 | Cum |
| 2 | Returning filling in, excavated soil including spreading, leveling, watering and well ramming in layers not exc 25cm thick complete all as specified. | 464.00 | Cum |
| 3 | Removing excavated materials/soil to a distance n.exc 50m and depositing where directed at a level n.exc 1.5 above the starting point complete all as specified and as directed by Engr-in-charge. | 116.00 | Cum |
| 4 | M & L in replacement of Galvanized steel water tubing medium grade of 25mm bore with & including all necessary fittings complete, laid in trenches, including taking up or down old unserviceable steel water tubing and connections of 25mm bore, complete all as specified and directed. Note 1 :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. Note 2 : Contractor shall visit the site & make plan for execution of pipe between the block without damaging the electrical cables,OFC/JFC Cables & Sewage pipelines.. | 700.00 | RM |
| 5 | M & L in replacement of Galvanized steel water tubing medium grade of 50mm bore with & including all necessary fittings complete, laid in trenches, including taking up or down old unserviceable steel water tubing and connections of 50mm bore, complete all as specified and directed. Note 1 :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. Note 2 : Contractor shall visit the site & make plan for execution of pipe between the block without damaging the electrical cables,OFC/JFC Cables & Sewage pipelines.. | 2500.00 | RM |
6 Days Left