| 1 | Servicing / Maintenance of passenger lifts G+6 (8 Nos of 8/13 passenger having capacity 544/884 Kg) (Make- Thyssenkrupp Elevator India Private Limited) by topping up oil in gear box and railing, and greasing all required parts, cleaning of car top and lift pit, electric power operated doors, auto electric leveling device installed, on the following points including checking tightening of all nut bolts electric connection, alingement of rope, greasing as required, also removing of fault as and when occurred by replacing the unserviceable parts like machines, motors, generators, ropes, inverter systems, and controller parts to be inclusive of printed circuit boards. Sub components inclusive of belts, rollers, gears, bearings, solenoids, coils, chocks brake shoes, liners, contacts, contactors, relays, coils, push buttons, door operator VVVF drive, car door safety device limit switches, governor, hoist way door locks, indicators, alarm bell, door sensors and other minor mechanical parts including taking out to old U/S parts and fixing of new parts, connecting, testing commissioning and making to lift in serviceable condition in minimum possible time all as specified and directed. | 11.00 | Per Month |
| 4 | (xi) Rescue operator to be deployed for three shifts of eight hours .Rate deemed to be included for any rescue operation for any emergency during the contract period for item No.1&2 including Saturday, Sunday and holiday for eleven calendor months period.(xii) As a part of maintainance ,OEM will provide basic training to CUSTOMER with respect to rescuing passengers entraped in elevators.(xiii) If contractor failed to rectify the complaint/breakdown within two day then recovery will be done as Rs 2000.00 Per day per lift.(xiv) Mob no.of OEM technician will be displayed on each lift and guard room.(xv) The contractor through OEM will carry out monthly,quarterly and half yearly maintainance as pewr particular specification within overall quoted rate for monthly,quarterly and yearly maintainance checks.
(xvi) The contractor will have to purchase platinum plan for the lifts from the OEM ,the same will be also mentioned in MOU. | | |
| 5 | Dismantling the cabin fans of size 300mm sweep from lift, removing the burnt out winding wires, rewinding with winding wires and insulation materials overhauling/servicing, greasing/ lubricating, insulating electric leads, bearing/ bushes , bolts nuts, condensor, assembling back checking for proper function and testing all as specified and as directed by Eng-in-Charge. | 2.00 | Each |