| Tender ID | 4174762 |
|---|---|
| Organisation Name | Department Of Cooperation |
| Tender Brief | Corrigendum : Construction Of Sewer Lines, Roads, Installation Of Electrical Poles Alongwith Allied Works Etc. Within Premises Of Verka Jalandhar Dairy. |
| Last Date For Submission | 1st Jun, 2026 |
| Opening Date | 02 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 384000.00 |
| Estimated Cost | 19200000.00 |
| City | Jalandhar |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of existing Reinforced cement conrete/ Brick work/ tile masonry in cement mortar, as per actual site conditions/ requirements, finishing the broken surface to match with the surrounding, removing the debris etc. within site/ campus. Including cutting the reinforcement if any and cleaning & stacking of dismantled bricks and bats for re-use in new work, complete in all respects as directed by the E-in-C. | 136.00 | Cum |
| 2 | Taking out existing CC interlocking paver blocks from footpath/ central verge/pavement, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in Charge. | 282.00 | Sqm |
| 3 | Dismantling / removing of existing damaged kerbs / channels including base (If required) and stacking the kerbs / channels and disposal of mulba etc. with in the site campus as per the direction of E-in-C. | 560.00 | Rmtr. |
| 4 | Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as diected by E-in-C. | 193.00 | Cum |
| 5 | Earth work in excavation for all type of foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent refilling around masonary etc. in 15 cms layers with compaction consolidation, including disposal of all surplus soil as directed , within campus/site. | 1863.00 | Cum |