Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4776994 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : 16. Consruction Of Sheri To Nimkheda Road (vr 150) Road Ch 0/700 To 1/500 Tal- Dharangaon, Dist- Jalgaon. |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 30000.00 |
| Estimated Cost | 2976436.00 |
| City | Jalgaon |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 721.28 | One Cubic Metre |
| 2 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97% of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with Power roller. | 468.83 | One Cubic Metre |
| 3 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) (a)80 mm Metal, By breaking Boulders (Hand broken). | 537.90 | One Cubic Metre |
| 4 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) (a)40 mm Metal, By breaking Boulders (Hand broken). | 244.50 | One Cubic Metre |
| 5 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | 782.40 | One Cubic Metre |
7 Days Left