Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Development Department
Tender ID4777064
Organisation NameRural Development Department
Tender BriefCorrigendum : 2. Stbt To Sh - 4 To Ambada Narad Road (vr-19) Km 0/00 To 1/00, Tal.chopda, Dist.jalgaon
Last Date For Submission22nd Jul, 2026
Opening Date24 Jul, 2026
Cost
Document Cost3500.00
EMD35000.00
Estimated Cost3472303.00
Location
CityJalgaon
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.774.30Per One Cu.M.
2Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed.469.80Per One Cu.M.
3Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken).133.40Per One Cu.M.
4Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken).385.70Per One Cu.M.
5Supplying hard murum/ kankar at the road site, including conveying and stacking complete.282.27Per One Cu.M.
22nd Jul, 2026

7 Days Left

WhatsApp