Tender BriefRepair And Restoration Of Flood Protection Work At Village Padarli
Last Date For Submission4th Aug, 2026
Opening Date05 Aug, 2026
Cost
Document Cost5000.00
EMD513882.00
Estimated Cost25694106.00
Location
CityJalore
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(b) Thick33390.00Sqm
2Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Soft soil5235.75Cum
3Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. with initial lead of 250 m . With lead beyond 1250 m and up to 1750 m( for average lead 1.5 Km)21866.28Cum
4Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. (ii) at least 98% of Standard Proctor's density21866.28Cum
5Watering of earth including cost of carriage of water when source of water is up to 1 Km.21866.28Cum
4th Aug, 2026