Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4963613 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Repair And Restoration Of Flood Protection Work At Village Padarli |
| Last Date For Submission | 4th Aug, 2026 |
| Opening Date | 05 Aug, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 513882.00 |
| Estimated Cost | 25694106.00 |
| City | Jalore |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(b) Thick | 33390.00 | Sqm |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Soft soil | 5235.75 | Cum |
| 3 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. with initial lead of 250 m . With lead beyond 1250 m and up to 1750 m( for average lead 1.5 Km) | 21866.28 | Cum |
| 4 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. (ii) at least 98% of Standard Proctor's density | 21866.28 | Cum |
| 5 | Watering of earth including cost of carriage of water when source of water is up to 1 Km. | 21866.28 | Cum |
19 Days Left