| Tender ID | 4011987 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair, Cleaning And Maint Of Sewage System At Map Accn And Central Amenities Area Of Sevoke Road Mil Stn Under Ge Sevoke Road |
| Last Date For Submission | 12th May, 2026 |
| Opening Date | 15 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4500000.00 |
| City | Jalpaiguri |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | De-sludging, Cleaning and dewatering of sludge(solid/liquid) from septic tank/manholes through pumping set or other mechanical means including cleaning of sludge/grass/bushes and disposing off sludge to a distance not exc 100m in the excavated pit of appropriate size as directed by Engineer-in-Charge including spreading bleaching powder and filling of pit by earth complete as specified and as directed by Engineer-in-Charge. Note :- (i) Earth to be filled over the pit shall be filled after sufficient absorption of liquid and size of pit shall be made accordingly. (ii) To avoid any health hazard or spreading of any foul gas, bleaching powder shall be spreaded as directed by the Engineer-in-charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc shall be deemed to be included in the rate quoted under this item. | 600.00 | CUM |
| 2 | Cleaning of sewage drain pipe of stone ware pipe, RCC Hume pipe , cast iron pipe of 75 mm bore by rodding with sectional sewer rod/flexible sewer rod/bucket etc thoroughly from inspection chamber to man hole or from one manhole to another manhole of any depth and size and well flushing with water after cleaning including removal of sludge and other materials obtained from cleaning the drain pipe and manhole garbage to a pit made for this purpose and filling up the earth complete as specified and as directed. Note :-(i) Cleaning of sewage line to be started from down stream side in this operation for which some pipe line gets cleaned automatically which needs to be cleaned by rodding only and hence the same shall not be measured (ii) The unit rate of the items shall be deemed to be included for the cost of removal of sludge/waste and water accumulated in manhole/inspection chamber due to cleaning of drain by rodding etc. (iii) The sludge obtained shall be deposited in an excavated pit and filled up with earth in layers of 30cm thick as directed by Engineer-in-Charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc. shall be included in the rate quoted under this item. (iv) To avoid any health hazard or spreading of any foul gas bleaching powder shall be spread over each earth layers as directed by Engr-in-Charge. | 400.00 | RM |
| 3 | All as per item No. 2.00 above but bore of pipe 100mm | 1000.00 | RM |
| 4 | All as per item No 2.00 above but bore of pipe 150mm | 1500.00 | RM |
| 5 | All as per item No. 2.00 above but bore of pipe 200mm | 3200.00 | RM |