Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4072425
Organisation NamePublic Works Department
Tender BriefConstruction Of Boys Toilet At High School Chak Larga. (under Samagra Shiksha Pab 2025-26 Zone Dansal Distt. Jammu) (2nd Call
Last Date For Submission4th May, 2026
Opening Date05 May, 2026
Cost
Document Cost600.00
EMD4700.00
Estimated Cost235000.00
Location
CityJammu
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :10.38Cum
2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)1.10Cum
3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)4.10Cum
4Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)0.49Cum
5Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 , landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size)1.19Cum
4th May, 2026

10 Days Left

WhatsApp