Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4613696 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of Lane And Drain At Nai Basti From Main Road To The H/o Sham Lal Mistri. Under Permanent Restoration (fy 2026-27) (ist Call) |
| Last Date For Submission | 3rd Jul, 2026 |
| Opening Date | 04 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 26760.00 |
| Estimated Cost | 0.00 |
| City | Jammu |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in filling by way of RBM filling and compacting with roller. | 34 | cum |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil | 20 | cum |
| 3 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical broom With rapid setting bitumen emulsion On W.B.M. /W.M.M. @ 0.4 Kg/sqm. | 600 | sqm |
| 4 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).With paving Asphalt grade VG-30 with no solvent | 600 | sqm |
| 5 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-30 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete | 600 | sqm |
10 Days Left