Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4154259 |
|---|---|
| Organisation Name | Housing And Urban Development Department |
| Tender Brief | Corrigendum : Construction Of Nallah Passing Through Channi Rama Culvert Near Fci Gowdan To Culvert In Trikuta Nagar Jammu And Construction Improvement Of Nallah Walls Near Jda Complex In Sector 5 Trikuta Nagar, Jammu Ward No 54 Contract No Sdj/w/10/2026-27 |
| Last Date For Submission | 16th May, 2026 |
| Opening Date | 18 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 842000.00 |
| Estimated Cost | 42100000.00 |
| City | Jammu |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 3588.48 | cum |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:25 meter beyond 1 m from cutting edge. All kinds of soil | 1537.92 | cum |
| 3 | Removal of unhygienic material(so classified by the site engineer) from designated sites and its disposal as per direction, all inclusive. | 3000.00 | cum |
| 4 | Demolishing cement concrete maually/by mechanical means including disposal of material within 50 metres lead 1:3:6 or richer mix | 720.00 | cum |
| 5 | Construction of temporary diversion bund by way of filling empty cement bags with sand including cost of sewing string and sand & placing in position. | 23247.00 | each |
4 Days Left