Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4511657 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Corrigendum : Provision Of Two No. Dug Wells Along With Laying Of Lines And Allied Works To Augment The Source Of Water Supply To Iit Jammu Campus Under (deposit Contribution Work) |
| Last Date For Submission | 30th Jun, 2026 |
| Opening Date | 02 Jul, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 1206420.00 |
| Estimated Cost | 60321000.00 |
| City | Jammu |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kind of soil | 6485.70 | cum |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | 1650.00 | cum |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50metres: All kinds of soil: | 369.00 | cum |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5m, as directed by Engineer-in-Charge. | 723.30 | cum |
| 5 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil: | 6872.70 | cum |
6 Days Left