Tendering Authority: Jammu Smart City
Tender ID4131225
Organisation NameJammu Smart City
Tender BriefCorrigendum : Reconstruction Of Protection Works For Under-construction Ipss Of Ueed By Way Of Providing Diaphragm Walls And Retaining Walls On The Right Bank Of River Tawi(bikram Chowk Bridge-gujjar Nagar Bridge) At I.christan Colony, Ii.prem Nagar, Iii.jogi Gate
Last Date For Submission18th May, 2026
Opening Date19 May, 2026
Cost
Document Cost10000.00
EMD1379239.00
Estimated Cost68961929.00
Location
CityJammu
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Protection Works around the 3 No's of IPS 1. Christian colony 2. Prem Nagar 3. Jogi Gate
2Clearing the site and carry out alignment survey work by total station as and when required including marking of centre line of alignment, taking ground level details of existing structures within construction area and additional areas/lengths if required. Rate includes fixing necessary reference pillars, establishing benchmark, establishing foundation layout on ground, including submission longitudinal section, cross section, and report of survey work in three copies with soft copy in CD to Engineer in charge as directed for protection work, centreline length of survey will be measured for payment. (The average width will be approximately 250 to 300m)500Rmt of centre line of survey
3Construction of 600 mm thick diaphragm wall inside ring bund above water level in R.C.C. grade M-30 of various depth. The rate includes construction of guide wall 1200 mm deep in R.C.C. grade M-15 of 100 mm thickness made from lightly reinforced concrete. Grabbing & trenching for diaphragm wall shall be carried out in all type of soil / sand / gravel, boulders by using hydraulic / mechanical diaphragm machine. Concrete should be produced in batching plant. The cost of reinforcement for diaphragm wall will be paid under saperate item. The contractor's rate should include the cost of following items:
4Site clearance before starting the work and after completion of work.
5Construction of guide wall in M15 grade concrete, including Earthwork in Excavation and or Backfilling. Demolishing and stacking of unused material of guide wall after completion of the diaphragm wall as directed by the Engineer. Cost of reinforcement in guide wall is included in guide wall cost.