Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4265508 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair To Sewage Line, Manhole And Manhole Cover, Septic Tank, Soak Pit And Other Connected Items Including Cleaning Of Sewage Line In Zone B Area At Bb Cantt, Srinagar |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 17 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 80000.00 |
| Estimated Cost | 4000000.00 |
| City | Jammu |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 meter wide and not exceeding 1.5 m in depth, getting out insoft/loose soil etc., including trimming bottom and sides of trenches, leveling/grading and ramming bottom of excavation, complete all as specified and directed. | 150.00 | CUBIC METRE |
| 2 | Excavation in trenches not exceeding 1.5 meter wide and not exceeding 1.5 m in depth, getting out in hard/dense soil etc., including trimming bottom and sides of trenches, leveling/grading and ramming bottom of excavation, complete all as specified and directed. | 12.00 | CUBIC METRE |
| 3 | Excavation in trenches not exceeding 1.5 meter wide and not exceeding 1.5 m in depth, getting out in Soft/Disintegrated rock etc., including trimming bottom and sides of trenches, leveling/grading and ramming bottom of excavation, complete all as specified and directed. | 60.00 | CUBIC METRE |
| 4 | Excavating over areas, n exc 1.5m deep & getting out in soft / loose soil and removing/depositing, spreading and leveling to a distance of 50 mtr away from excavation point, complete all as specified and directed. | 45.00 | CUBIC METRE |
| 5 | Description all as per serial item No 4 here-in-before, but exceeding 1.5 mtr deep but not exc 3.00 mtr deep in hard/dense soil complete all as specified and directed and removing/epositing , spreading and leveling to a distance of 50 mtr away from excavation point, complete all as specified and directed. | 45.00 | CUBIC METRE |
6 Days Left