| Tender ID | 4458326 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Roof And External Painting In Building No P-26 And P-29 In Vijay Vihar At Sunjuwan Under Ge Jammu |
| Last Date For Submission | 27th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 48460.00 |
| Estimated Cost | 2423000.00 |
| City | Jammu |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | B/R Portion: - Complete removal of the existing roof treatment any nos of layers taken out membrane, PCC Padding/roof, tiles etc including grabbing up of tree roots, roughening and preparation of surfaces of old concrete floor by picking, scrubbing down with steel brushes, sweeping, cleaning and washing down with water to remove dust etc. complete all as specified and as directed. | 650.00 | Square Metre |
| 2 | Rendering 10mm thick on concrete fair faces with cement morter (1:3) including water proofing compound complete all as specified and as directed. | 650.00 | Square Metre |
| 3 | Applying bituminous primer/ tack coat of industrial bitumen 85/25 at the rate of 1.2 Kg per Sqm including cleaning of surface conforming to IS-3384 complete all as specified and as directed. | 650.00 | Square Metre |
| 4 | APP (Atactic Polypropylene) based polymeric membrane minimum 3mm thick, weight not less than 3.6 kg/Square metre with non woven polyster not less than 150 Grams/Square metre laid on primed surface by forced application with side overlap minimum 100 mm. The membrane shall be laid with LPG torch and overlap sealed and finished with two coats of bituminous based aluminium paint complete all as specified and as directed. | 650.00 | Square Metre |
| 5 | 25 mm thick (average thickness) PCC (1:2:4), type B-0 (using 12.5mm graded crushed stone aggregates) as in roof padding including preparation of surface and mix with water proofing compound and finished even and fair without using extra cement complete all as specified and as directed. Note: - WPC will be measured and paid separately as supply only. | 650.00 | Square Metre |