Tender BriefDesign, Supply, Installation, Testing, Commissioning Of Hvac System At Teaching Hospital, Government Medical College Doda
Last Date For Submission20th Jun, 2026
Opening Date22 Jun, 2026
Cost
Document Cost3000.00
EMD996000.00
Estimated Cost49794781.00
Location
CityJammu
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1AIR DISTRIBUTION (FOR AIRCONDITIONING) GSS DUCTING
2Supply, installation, balancing and commissioning of factory fabricated GSS sheet metal rectangular/round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as specifications of following sheet thickness complete as required. In special situations in health care facility (e.g., operating rooms, delivery rooms, catheterization laboratories, angiography rooms ICU/ CCU, HEPA-filtered rooms for immune-suppressed patients) Iincluding the specifications given below the direction of air movement needs to be controlled. The air is introduced from ceiling registers on the perimeter and is returned or exhausted through registers located at least 6 inches above the floor. This arrangement provides a downward movement of clean air through the breathing and working zones to the contaminated floor area for exhaust.
30.63 MM (24 gauge) Galvanized Sheet Steel Ducting1400Sqm.
40.80 MM (22 gauge) Galvanized Sheet Steel Ducting400Sqm.
5Supply, installation, balancing and commissioning of fabricated at site fabricated Aluminium sheet metal rectangular/round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. and specifications of following sheet thickness complete as required. In special situations in health care facility (e.g., operating rooms, delivery rooms, catheterization laboratories, angiography rooms ICU/ CCU, HEPA-filtered rooms for immune-suppressed patients) Iincluding the specifications given below the direction of air movement needs to be controlled. The air is introduced from ceiling registers on the perimeter and is returned or exhausted through registers located at least 6 inches above the floor. This arrangement provides a downward movement of clean air through the breathing and working zones to the contaminated floor area for exhaust.