| Tender ID | 4857256 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Permanent Restoration Works Damages Occurred During The Month Of August And September 2025 W.r.t. Varous Water Supply Schemes Of Sub-division Kandi-ii (jandrah, Badsoo, Panjgrain, Marh And Jagti) Part-2 Under (sasci 2026-27) |
| Last Date For Submission | 14th Jul, 2026 |
| Opening Date | 15 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 265440.00 |
| Estimated Cost | 13272000.00 |
| City | Jammu |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50metres: All kinds of soil: | 347.76 | Cum |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposalofsurplusexcavatedearthasdirected,withinaleadof50metres: OrdinaryRock | 148.44 | Cum |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil: | 4078.70 | Cum |
| 4 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 meters leadas per direction of Engineer-in-charge: Above 40 mm nominal bore (GI & HDPE) | 1000.00 | Mtr |
| 5 | Welding, including transportation of plant at site etc. complete. By electric plant | 21526.40 | CM |