Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3708956 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair / Maintenance Of Package Ac Plant, Split Acs, Water Cooler And Its Allied Works At Af Station Khambhaliya And Dwarka Under Ge (af) Jamnagar No.2 |
| Last Date For Submission | 11th Apr, 2026 |
| Opening Date | 13 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 40000.00 |
| Estimated Cost | 2000000.00 |
| City | Jamnagar |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M & L for annual servicing of split air conditioner cap 1.5/2.0 ton by disconnecting electric connection from its stabilizer or its electric board and remove the front cover or indoor AC unit and cleaning it with pressurized water and nylon brush, refixing the front cover of indoor unit. Remove the outer cover of out door unit and covered the condensing unit with ploythene / plastic cover so that water shall not be entered in the motor while cleaning the unit and filter with pressureized water then apply one coat of descaling solution and clean with wire mesh bursh/nylon brush to the condensing coil of out door unit and greasing of all moving parts. Cleaning of Cooling and condenser coil of indoor and outdoor unit shall be properly carried out without damaging other parts. Checking and making serviceable electrical connection of DBs, Stabilizer, wiring of ACs as per site condition and tightening all electrical connection complete all as specified and directed. Note - Replacement of defective parts with new parts shall be measured and paid seperately under respective items in the schedule. | 35 | Each Job |
| 2 | Material and labour for leak testing of cooling coils attached with indoor and outdoor unit of split air conditioner uisng CO2/Nitrogen gas, arrest of leakage with brazing of copper pipe and retest again for leakage complete all as specified and directed. | 30 | Each Job |
| 3 | M & L for charging of refrigerant R-22/R32 gas to air conditioner or as per existing /manufacturer instrcutions suitable for split air conditioner cap 1.5 ton after flushing out the entire refrigerant, vaccum testing of entire closed loop system for 24hrs and charging the unit with specified quantity of gas, as per manufacturer instructions,as mentioned above complete all as specified and directed. | 30 | Kg |
| 4 | All as per item no.3 above but for 2.0 ton capacity complete as per manufacturer instructions complete all as specified and directed. | 20 | Kg |
| 5 | Material and labour for maintenance of air conditioner 1.5/2.0 ton capacity, split type unit with replacement of old/unsv spare parts mentioned as under or as per manufacturer instructions including testing on load complete all as specified and directed. |
6 Days Left