| Tender ID | 5154721 |
|---|---|
| Organisation Name | Roads And Buildings Department |
| Tender Brief | Surveying Of Various Roads With Total Station Instrument, Alignments, Leveling With Drawings And Computation Of Quantity Under Jurisdiction Of R & B Division, Jamnagar. (2nd Try) |
| Last Date For Submission | 7th Aug, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 900.00 |
|---|---|
| EMD | 500000.00 |
| Estimated Cost | 0.00 |
| City | Jamnagar |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Detailed Topographical & Level survey of road by Total Station Instrument on Road site and providing details like electrical Pole, Telephone Pole, Tree, Bridge & Culverts, road and cross junction details and taking OGL within 30 mt. total width at every 10m. Interval at sharp curve as per Directed by The Engineer and submitting all details in Alignment Drawings in soft copy i.e. CD/Pen Drive and hard copy. | 1.000 | Per Km |
| 2 | Preparing Estimates & DTP for Widening portion / New Const. of providing Plan, Setcion Etc.Work for Estimated cost, incl.providing all drawing like as plan, elevation & SEtcion etc. required in estimates and scructing estimate from sanction authority and get technical sanction including all survey work with labour and material including SBC required for designing. 2(A) H.P. Drain / Box Culvert/ Slab Drain | 1.000 | percentage of Estimate amount |
| 3 | 2(B) Protetcive Wall/ Retaining Wall | 1.000 | percentage of Estimate amount |
| 4 | Preparing and Providing Plans, Estimate & DTP for the new road work for Estimated cost incl, providing all drawing like as plan, elevation & Setcion etc. with detailed topographical & Level survey of road by Total Station Instrument on Road site and providing details like electrical Pole, Telephone Pole, Tree, Bridge & Culverts, road and cross junction details and taking OGL within 30 mt. total width at every 10m. Interval at sharp curve as per Directed by The Engineer and submitting all details in Alignment Drawings in soft copy i.e. CD/Pen Drive and hard copy. required in estimates including level sheet and quantity sheet required as per instruction of engineer in charge and scructing estimate from sanctioning authority and get technical sanction including all survey work with labour and material including all survey work and required testing (FWD, NSV, CBR, SBC etc for required for designing) 3(A) Cost up to 1 Cr. | 1.000 | percentage of Estimate amount |
| 5 | 3(B) Cost upto 1.00 cr to 5.00 Crore | 1.000 | percentage of Estimate amount |