Tendering Authority: Roads And Buildings Department
Tender ID5154721
Organisation NameRoads And Buildings Department
Tender BriefSurveying Of Various Roads With Total Station Instrument, Alignments, Leveling With Drawings And Computation Of Quantity Under Jurisdiction Of R & B Division, Jamnagar. (2nd Try)
Last Date For Submission7th Aug, 2026
Opening DateRefer to Documents
Cost
Document Cost900.00
EMD500000.00
Estimated Cost0.00
Location
CityJamnagar
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Detailed Topographical & Level survey of road by Total Station Instrument on Road site and providing details like electrical Pole, Telephone Pole, Tree, Bridge & Culverts, road and cross junction details and taking OGL within 30 mt. total width at every 10m. Interval at sharp curve as per Directed by The Engineer and submitting all details in Alignment Drawings in soft copy i.e. CD/Pen Drive and hard copy.1.000Per Km
2Preparing Estimates & DTP for Widening portion / New Const. of providing Plan, Setcion Etc.Work for Estimated cost, incl.providing all drawing like as plan, elevation & SEtcion etc. required in estimates and scructing estimate from sanction authority and get technical sanction including all survey work with labour and material including SBC required for designing. 2(A) H.P. Drain / Box Culvert/ Slab Drain1.000percentage of Estimate amount
32(B) Protetcive Wall/ Retaining Wall1.000percentage of Estimate amount
4Preparing and Providing Plans, Estimate & DTP for the new road work for Estimated cost incl, providing all drawing like as plan, elevation & Setcion etc. with detailed topographical & Level survey of road by Total Station Instrument on Road site and providing details like electrical Pole, Telephone Pole, Tree, Bridge & Culverts, road and cross junction details and taking OGL within 30 mt. total width at every 10m. Interval at sharp curve as per Directed by The Engineer and submitting all details in Alignment Drawings in soft copy i.e. CD/Pen Drive and hard copy. required in estimates including level sheet and quantity sheet required as per instruction of engineer in charge and scructing estimate from sanctioning authority and get technical sanction including all survey work with labour and material including all survey work and required testing (FWD, NSV, CBR, SBC etc for required for designing) 3(A) Cost up to 1 Cr.1.000percentage of Estimate amount
53(B) Cost upto 1.00 cr to 5.00 Crore1.000percentage of Estimate amount