Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation Department
Tender ID4241971
Organisation NameIrrigation Department
Tender BriefConstruction Of Roof Top Rain Water Harvesting By Boaring -cluster-11
Last Date For Submission28th May, 2026
Opening Date28 May, 2026
Cost
Document Cost770.00
EMD85000.00
Estimated Cost0.00
Location
CityJaunpur
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Cleaning of grass and removal of rubbish upto a distance of 30m outside the periphery of the area as per Technical Specification Clause 201 PWD SOR Ch-5 sl no.-1 (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.)144.00sqm
2Excavation in foundation in ordinary soil ( loam clay or sand) including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated soil into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth upto a distance of 30m. As per PWD SOR Ch-5 sl no.-1 (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.)95.28cum
3Concrete with 4cm gauge brick ballast , coarse sand and cement in proportion of 8:4:1 in foundation and under floor including supply of al mateials, labour and tools and plants etc required for proer completion for the work. As per PWD SOR Ch-6 sl no.-3[275] (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.)15.36cum
4M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants etc required for proper completion of work. As per PWD SOR Ch-7 sl 4[305 (b)] (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.)34.47cum
5M-150 brick work in 1:4 cement and coarse sand mortar in super structure including necessary cutting and mouliding of bricks required and also including honey comb brick work thickness walls more than one brick and for extea labour to above. As per PWD SOR Ch-7 sl 4[305 (b)] +7[309] (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.)2.20cum
28th May, 2026

16 Days Left

WhatsApp