Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4080204 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Under District Jaunpur, Construction Of Road From Kahardhamsahar Basti To Chaksudi In Village Nihalpur Of Kerakat Block, Lot No 87 |
| Last Date For Submission | 8th May, 2026 |
| Opening Date | 08 May, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 50520.00 |
| Estimated Cost | 2526000.00 |
| City | Jaunpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Work | ||
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 1863.00 | Cum |
| 3 | Construction of granular sub-base by providing well graded material , spreading in uniform layers with moter graded on prepared surface ,mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achive the desired density, complete as per Technical Specification Clause. 401. | 162.10 | Cum |
| 4 | Providing laying spreading and compacting stone aggregates of water bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber applying and brooming requisite type of screening materials Course Sand to fill-up the interstices of course aggregtate watering and compacting to the required density grading 2 as per Technical Specification clause 405. | 159.47 | Cum |
| 5 | Providing laying spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled smooth roller 80-100 KN in stages to proper grade and camber applying and brooming requisite type of screening/binding materials to fill-up the interstices of course aggregtate watering and compacting to the required density grading 3 as per Technical Specification clause . MoRD Spec. 405 Chapter 4 SI.No. 4.7 | 159.47 | Cum |
14 Days Left