Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4036819 |
|---|---|
| Organisation Name | Tribal Area Development Department |
| Tender Brief | Construction Of New Tad Boys Ashram Hostel (capacity 50) At Mau Borda Khanpur District Jhalawar |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 07 May, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 671000.00 |
| Estimated Cost | 33531000.00 |
| City | Jhalawar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 649.96 | Sqm |
| 2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. And lift up to 1.5 Mtr. | 677.84 | Sqm |
| 3 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 1130.59 | Cum |
| 4 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Ordinary rock | 437.24 | Cum |
| 5 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 220.92 | Cum |
19 Days Left