Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4155465 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Construction Of Interlocking Tile Road With Drain In The Block A, F And H In Rehabilitation Colony At Village Chatrapura Tehsil Atru Under Parwan Major Multipurpose Irrigation Project Dist. Baran |
| Last Date For Submission | 25th May, 2026 |
| Opening Date | 26 May, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 1422828.00 |
| Estimated Cost | 71141404.00 |
| City | Jhalawar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard soil mixed with Kankar / boulders, Morrum | 862.90 | Cum |
| 2 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Hard rock not requiring blasting | 6040.31 | Cum |
| 3 | Excavation with line drilling, controlled blasting near structures, populated area (situated within 50m) including dewatering, loading,unloading, disposal & dressing within initial lead of 50m and lift upto 1.5m complete in all respect in dry or moist and also including compensation of damages if any , in : Phylite and other hard rock requiring nominal blasting | 1725.80 | Cum |
| 4 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.Add extra for each subsequent lead of 500m or part there of beyond Km and up to 2 km | 4347.63 | Cum |
| 5 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 2484.36 | Cum |
4 Days Left