Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4243619 |
|---|---|
| Organisation Name | Panchayati Raj Department |
| Tender Brief | Corrigendum : As Per Nit Sr. No.-52 |
| Last Date For Submission | 28th May, 2026 |
| Opening Date | 28 May, 2026 |
| Document Cost | 2497.00 |
|---|---|
| EMD | 211600.00 |
| Estimated Cost | 2497000.00 |
| City | Jhansi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming,stone screening / binding material to fill-up the interstices of coarse aggregate,watering and compacting to the required density Grading 2 as per technical Specification Clause 405. | 27.000 | M3 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 178.950 | M3 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. | 875.250 | M3 |
| 4 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead up to 50 m as per Technical Specification Clause 302.3 | 37.950 | M3 |
| 5 | Laying brick soling layer on prepared sub-grade with brick on edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing as per Technical Specification Clause 412. | 330.000 | M2 |
7 Days Left