| Tender ID | 4393292 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : Vikas Khand Gursarai Ke Mauja Madhupura Main Bhajju Raikwar Ke Bade Lalpura Sarkar Hanuman Ji Mandir Ki Aur Apex Road Abam Nali Ka Nirman Karya |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 854.00 |
|---|---|
| EMD | 43000.00 |
| Estimated Cost | 2112000.00 |
| City | Jhansi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in cutting or in embankment in moorum mixed soil (in Bundelkhand areas, requiring use of special T&P such as pick axes and sabbals etc.) excavation to be in the form of regular pits not exceeding 1/2 meter (20'') in depth including rammaing and dressing the surface to required, lavels and slopes and also including 1.5 m. (5ft), lifts and 30 m. (100ft) lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within two km. distance including cost of royalty as directed by Engineer-in-charge | 159.320 | Per Cum. |
| 2 | Construction of granular sub base by providing well graded material, spriding in uniform layers with motor grader on prepared surface mixing by mix in place method with roatvetor at OMC .and compacting with smooth wheel roaller to achieve the desiersd density, complet as per technical specification Clause 400.1 | 189.000 | Per Cum. |
| 3 | Providing and Laying of 80 mm interlocking concrete block pavement laid In stone dust base and 1OInt with fine sand. Joint filled after labling and dressing base including supply of all materails, labours, T&P etc required for proper completion of the site | 1890.000 | Per Sqm. |
| 4 | Supply and fixing of sign board including painting and lettering as directed by Engineer-in-charge. | 1.000 | Per No. |
| 5 | Excavation in foundation in moorum mixed soil(in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation trenches. | 29.680 | Per Cum. |