Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3930944 |
|---|---|
| Organisation Name | Uttar Pradesh Jal Nigam |
| Tender Brief | Naraini Nagar Panchayat Re-orgination Water Supply Scheme. |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 04 May, 2026 |
| Document Cost | 23600.00 |
|---|---|
| EMD | 3154000.00 |
| Estimated Cost | 315468046.00 |
| City | Jhansi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | CIVIL WORKS | ||
| 2 | INTAKE WELL | ||
| 3 | Detailed hydrological and geological survey, Site Survey, Testing for bearing capacity of soil, Design, obtaining necessary approvals and Construction of INTAKE structure / well (Capacity 10.50 MLD) Cum Pump House and Approach bridge ,Dewatering arregement, well sinking, Approach Channel Shoring for Coffer Dam including removal of coffer dam. Cost includes all material, Tools & Plants and labour complete for construction of said intake well. Cost includes all necessary river protection works and all necessary arrangements to ensure required raw water intake in all seasons (especially for Dry weather flow) complete in all respect as directed by Engineer in-charge. | 1.00 | Nos |
| 4 | WATER TREATMENT PLANT | ||
| 5 | Detailed Geographical and hydrological Survey, Site investigation, Testing for bearing capacity of soil, Designing, obtaining necessary approvals with Supply of all materials labour ,Tools & plants for Construction of Water Treatment Plant of 6 MLD capacity (Net out-put capacity i.e. excluding overloading,add 20 % overloading i.e 7.2 MLD) water treatment plant with PLC-SCADA based automation with space saver/ compact and efficient modern treatment technology with construction of MCWR 500 KL capacity. The Treatment Plant as per approved hydraulics essentially consists of the units for : Inlet Chamber, Pre-Sedimentation Unit, Settling Tank ,Venturi Flume ,Flash Mixer, Alum Solution, Tank Chemical House, high to ultra highrate clarifiers, Clarifloculator, high rate filtration unit, Rapid Graity Filters Back Wash Tank Air Blower Post Chlorination Inlet, Outlet , Back Wash Gutter , Troughs , Weirs Reuse of Back Wash Water Thickened Sludge Sump & Pump House Filterate Sump & Pump House Clear Water Sump for Backwash,Clear Water Outlet Chamber Sludge Drying Beds. All other required units. Cost includes all necessary Civil , E&M and SCADA works as per approved by competent authority complete in all respect as directed by Engineer in-charge. | 1.00 | Nos |
27 Days Left