| Tender ID | 4032382 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Widening Work From Konch Pahargaon To Santoshi Mata Temple Via Mela Ground |
| Last Date For Submission | 25th Apr, 2026 |
| Opening Date | 25 Apr, 2026 |
| Document Cost | 5400.00 |
|---|---|
| EMD | 1425000.00 |
| Estimated Cost | 24500000.00 |
| City | Jhansi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per Morth specification 301 Sr. 3.06 | 1323.75 | Cum |
| 2 | Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Compaction Only) as per Morth specification 305 Sr. 3.17 | 1323.75 | Cum |
| 3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 79.98 | Cum |
| 4 | Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade. | 6600.00 | Cum |
| 5 | By Mix in Place Method Construction of granular sub-base (Grade-I) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 as per Morth specification 401 Sr. 4.01 | 1619.94 | Cum |