Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4453558 |
|---|---|
| Organisation Name | West Bengal State Cooperative Marketing Federation Limited |
| Tender Brief | Corrigendum : Construction Of New Meter Room For Electrical Connection At New Build-ing Of Ccm Jhargram |
| Last Date For Submission | 23rd Jun, 2026 |
| Opening Date | 25 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 5028.00 |
| Estimated Cost | 251419.00 |
| City | Jhargram |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 13.489 | Cu. M. |
| 2 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 3.727 | Cu. M. |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 12.498 | Sq.M. |
| 4 | Anti termite treatment to bottom surface ( in case of masonry foundation and basements) and the sides ( upto a height of 300 mm. from bottom) of the excavation trenches with chemical emulsion by admixing chloropyrofos emulsifiable concentrates (1% concentration) with water by weight at the rate of 5 Litres per sq. m. area. The work shall be carried out as per specification described in 6.2.1. of code IS-6313 (part -II) 1981.( Mode of measurment will be the plan area of foundation treated.) | 12.498 | Sq.M. |
| 5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 47.030 | Sq.M. |
6 Days Left