Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4172529 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Corrigendum : Drilling Of 125mm Dia Nominal Bore Holes For Hand Pump 15 Nos And Installation Of India Mark-ii / Extra Deep Well Hand Pumps Complete Including Construction Of Platform In Division Nawalgarh, District Jhunjhunu |
| Last Date For Submission | 14th May, 2026 |
| Opening Date | 15 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 55060.00 |
| Estimated Cost | 2753000.00 |
| City | Jhunjhunu |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended pto date) and technical specifications, with gravel as per IS:4097-1967 and it s packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it s primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. Rate is Exclusive of GST. Nominal bore 125 mm dia. | ||
| 2 | Nominal bore 125 mm dia. | 1000.00 | Mtr |
| 3 | Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS: 2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technicalspecifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. Rate is Exclusive of GST. Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. Nominal bore 125 mm dia. | ||
| 4 | Nominal bore 125 mm dia. | 80.00 | Mtr |
| 5 | Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. Rate is Exclusive of GST. Nominal bore 125 mm dia | 455.00 | Mtr |
Ending Today