Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4446917 |
|---|---|
| Organisation Name | Department Of Local Bodies |
| Tender Brief | Construction And Repair Of Interlocking Tile Roads At Various Places In Zone 05 |
| Last Date For Submission | 16th Jun, 2026 |
| Opening Date | 16 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 98000.00 |
| Estimated Cost | 4900000.00 |
| City | Jodhpur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | 1.0 | cum |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by ngineer.Lime Concrete, cement concrete grade M-10 (1:5:10) and below | 1.0 | cum |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Bituminous courses | 1.0 | cum |
| 4 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer.Granular courses | 1.0 | cum |
| 5 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and crossvsections, including disposal of surplus material with all lift and leadvupto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 1.0 | cum |
16 Days Left