Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4446925 |
|---|---|
| Organisation Name | Department Of Local Bodies |
| Tender Brief | Construction Of B.t Road And Sewer Line At Cholawto Ka Bera To Panwaro Ka Bera And Other Place In Ward No.74 |
| Last Date For Submission | 16th Jun, 2026 |
| Opening Date | 16 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 2500000.00 |
| City | Jodhpur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Bituminous courses | 15.000 | cum |
| 2 | Granular courses | 30.000 | cum |
| 3 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and crossvsections, including disposal of surplus material with all lift and leadvupto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 500.000 | cum |
| 4 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), rehandling of material/earth to complete the task. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 135.000 | Cum |
| 5 | Providing, laying, spreading (with paver finisher only) and bcompacting wet mix macadam (WMM) base course comprising ofbgraded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratoryroller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion | 375.000 | cum |
16 Days Left