Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4828525 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Widening And Construction Of Cc Road From Chopasani To Choukha Km 0/00 To 7/00 |
| Last Date For Submission | 23rd Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 2430000.00 |
| Estimated Cost | 121500000.00 |
| City | Jodhpur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of reference bench mark (1 No.), working bench mark (4 Nos.) and near all drainage structures and bridges (as per direction of Engineer-in-charge), reference pillar/ burgees @ 50m interval on both side of formation width including marking of centre line, setting out curves, recording of levels, white washing and lettering etc. complete as per MoRTH specifications cl. 109. | 7.60 | Km |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 2.77 | Hect |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means : Bituminous Courses & Granular Courses | 435.95 | Cum |
| 4 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 990.00 | Cum |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 17167.00 | Cum |
16 Days Left