Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4770064
Organisation NamePublic Works Department
Tender BriefCorrigendum : Widening And Strengthening Work Of Sh- 62 Nayagaon To Kot Diver (nh- 48) Road Km 0/0 To 7/0
Last Date For Submission27th Jul, 2026
Opening Date28 Jul, 2026
Cost
Document Cost5000.00
EMD1744000.00
Estimated Cost87200000.00
Location
CityJodhpur
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle3.98Hac
2Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202.By Mechanical Means:Bituminous Courses & Granular Courses444.15Cum
3Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.5322.64Cum
4Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 Note :- Deduct if excavated earth as per item No. 3.5 (ii) is used and pushed for filling in embankment.5322.64Cum
5Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.317321.55Cum
27th Jul, 2026

18 Days Left

WhatsApp