Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3751029
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Provn Of Sewage Treatment Plant At Saraibari At Jorhat Under Ge Jorhat
Last Date For Submission7th Apr, 2026
Opening Date09 Apr, 2026
Cost
Document Cost2000.00
EMD307160.00
Estimated Cost23216000.00
Location
CityJorhat
StateAssam

Register to see full details

BOQ Items
#ItemQtyUnits
1Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in soft / loose soil complete all as specified and directed.545.00Sqm
2Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) in all kind of soil not exceeding 1.50 m in depth , including dressing of sides and amming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed.1752.19Cum
3Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) in all kind of soil exceeding 1.50 m in depth but not exceeding 3.00 m in depth , including dressing of sides and amming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed.800.08Cum
4Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) in all kind of soil exceeding 3.00 m in depth but not exceeding 4.50 m in depth , including dressing of sides and amming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed.177.22Cum
5Excavating in trenches, n exc 1.5 m wide and not exceeding 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sqm on plan and getting out soft/loose soil complete all as specified and directed.342.00Cum
7th Apr, 2026

6 Days Left

WhatsApp